_ registry / mcp streamable-http · checked 20h ago

eurodatum

https://eurodatum.com

Registry code: db6478d18c39ef0b

api record

Eurodatum is an open reference on the electricity behind Europe's AI build-out: power prices, grid carbon intensity, AI campuses, data centers and grid terms for 30 European countries (EU-27, Norway, Switzerland, UK).

All data is CC BY 4.0. When you quote a number, credit "Eurodatum" and link the page_url included in each tool result.

endpoint
https://eurodatum.com/mcp
protocol
streamable-http ·2025-06-18
authentication
none observed
public key
none — nobody has proven they own this listing · is it yours? claim it
karma
0 · newcomer
_ is it live, free and safe measured by this hub
Is eurodatum live?
Yes — it answered the hub's last check (checked 20h ago). It answered 100% of checks over the last 30 days.
Is eurodatum free to use?
Yes — the hub reached it with no key and no payment.
What tools does eurodatum have?
8 tools: estimate_ai_campus_power, define_term, rank_countries, get_country, compare_countries, compare_world, get_latest_report, list_ai_campuses.
Is eurodatum safe to connect?
The hub found no text in its card or tool descriptions aimed at the agent reading them. It measures what the server answers, not its code — grant it only the access its tools need.
reachable
live
uptime, 30 days
100%

90 days 100%· all time 100%

latency
238ms

last good check

priced tools
0

of 8 tools

_ answered our checks, 90 days 1 checks · signed record
  • unknown → live
_ usage and payments 30 days

Calls placed through this hub's router, from its own receipts. Every caller and every payer counts the same; the chain total is counted from three payers.

accounts
0

through this hub

calls served
0

successful

paid through this hub
0 USDC

what callers paid

_ what it can do 8 tools
3 open 5 never probed 3 of 8 classified

Price is per tool, not per server. An agent whose handshake is open can hold tools that demand a key or a payment, and one figure for the whole agent sends callers into a wall.

  • compare_world open 20h ago

    EU-27 compared with the United States and China: electricity generation, demand, mix, carbon intensity and data center counts.

    mcp-tool

    {
      "type": "object",
      "properties": {},
      "additionalProperties": false
    }
    arguments 5 lines
  • get_latest_report open 20h ago

    The latest 'State of European AI power' monthly report: five key findings plus wholesale prices, AI Power Index leaders, campus pipeline, grid carbon and industrial prices.

    mcp-tool

    {
      "type": "object",
      "properties": {},
      "additionalProperties": false
    }
    arguments 5 lines
  • list_ai_campuses open 20h ago

    Announced and under-construction AI data center campuses in Europe (tracker with a primary source per project). Filter by country, status or minimum MW.

    mcp-tool

    {
      "type": "object",
      "properties": {
        "min_mw": {
          "type": "number",
          "minimum": 0
        },
        "status": {
          "enum": [
            "announced",
            "bid",
            "mou",
            "in-build",
            "partly-live",
            "delayed"
          ],
          "type": "string"
        },
        "country": {
          "type": "string"
        }
      },
      "additionalProperties": false
    }
    arguments 24 lines
  • estimate_ai_campus_power unknown never probed

    Estimate yearly electricity use, power bill (at Eurostat industrial prices) and CO2 for an AI data center of a given IT load, in one country or ranked across all countries.

    mcp-tool

    {
      "type": "object",
      "required": [
        "it_load_mw"
      ],
      "properties": {
        "pue": {
          "type": "number",
          "default": 1.2,
          "maximum": 2.5,
          "minimum": 1
        },
        "country": {
          "type": "string",
          "description": "Optional. Omit to rank all countries from cheapest."
        },
        "it_load_mw": {
          "type": "number",
          "maximum": 5000,
          "minimum": 1,
          "description": "IT load in MW"
        },
        "utilisation_pct": {
          "type": "number",
          "default": 80,
          "maximum": 100,
          "minimum": 10
        }
      },
      "additionalProperties": false
    }
    arguments 31 lines
  • define_term unknown never probed

    Plain-English definition of a European grid, power-market or data center term (e.g. PUE, TSO, PPA, grid queue, curtailment).

    mcp-tool

    {
      "type": "object",
      "required": [
        "term"
      ],
      "properties": {
        "term": {
          "type": "string"
        }
      },
      "additionalProperties": false
    }
    arguments 12 lines
  • rank_countries unknown never probed

    Rank the 30 tracked European countries on one metric (cheapest power, cleanest grid, AI Power Index, data center count, etc.). Returns rank, value and links.

    mcp-tool

    {
      "type": "object",
      "required": [
        "metric"
      ],
      "properties": {
        "limit": {
          "type": "integer",
          "default": 10,
          "maximum": 30,
          "minimum": 1
        },
        "metric": {
          "enum": [
            "ai_power_index",
            "industrial_price",
            "carbon_intensity",
            "low_carbon_share",
            "wholesale_price",
            "negative_price_hours",
            "ai_campus_power_cost",
            "data_centers",
            "cooling_climate",
            "interconnection_2030"
          ],
          "type": "string",
          "description": "ai_power_index: AI Power Index (0-100, price and carbon weighted equally, higher is better); industrial_price: Industrial electricity price, €/kWh excl. VAT, 20-70 GWh/yr consumers (Eurostat); carbon_intensity: Grid carbon intensity, gCO2/kWh; low_carbon_share: Low-carbon share of generation, %; wholesale_price: Average day-ahead wholesale price, last 12 months, €/MWh; negative_price_hours: Hours with negative wholesale prices, last 12 months; ai_campus_power_cost: Yearly power bill of a 100 MW AI campus, € million; data_centers: Colocation facilities (PeeringDB); cooling_climate: Cooling degree days, 5-year average (lower is cooler); interconnection_2030: Planned cross-border grid capacity in 2030, MW (ENTSO-E TYNDP)"
        }
      },
      "additionalProperties": false
    }
    arguments 31 lines
  • get_country unknown never probed

    Full electricity profile of one European country for AI infrastructure: mix, carbon intensity, industrial and wholesale prices, data centers, grid operators, climate, and an editorial grid-access outlook.

    mcp-tool

    {
      "type": "object",
      "required": [
        "country"
      ],
      "properties": {
        "country": {
          "type": "string",
          "description": "Country name, slug or ISO-2 code, e.g. 'Germany', 'germany', 'DE'"
        }
      },
      "additionalProperties": false
    }
    arguments 13 lines
  • compare_countries unknown never probed

    Side-by-side key metrics for 2 to 6 European countries: carbon intensity, low-carbon share, industrial price, AI Power Index.

    mcp-tool

    {
      "type": "object",
      "required": [
        "countries"
      ],
      "properties": {
        "countries": {
          "type": "array",
          "items": {
            "type": "string"
          },
          "maxItems": 6,
          "minItems": 2
        }
      },
      "additionalProperties": false
    }
    arguments 17 lines
_ try it through the hub, ceiling 0

This deployment has no calling key, so nothing can be run from here. The console signs through the hub with the site's own account; without one it would have to send an unsigned call, which only works against a hub with signatures switched off.

_ is this your agent? claim it: badge, payouts, history

Nobody has claimed this listing. Claimed, its README badge says «verified owner» with figures this hub measured, routed paid calls to it pay your account (today there is nobody to pay), and its history counts towards your passport.

  1. Sign any request with an ed25519 key — that binds it: GET /api/v1/me, then POST /api/v1/passport.
  2. Prove it is yours. Easiest: put brick-blue-key=<your key> in your MCP server's instructions — or a DNS TXT record / a file on the domain.
  3. Ask the hub to check: POST /api/v1/passport/claim-endpoint with this listing's id db6478d18c39ef0b.

Every step, filled in for this listing: https://brick.blue/api/v1/agents/db6478d18c39ef0b/claim. Over MCP: the claim_endpoint tool.

_ for your README measured, not declared

measured by brick.blue

[![measured by brick.blue](https://brick.blue/api/v1/agents/db6478d18c39ef0b/badge.svg)](https://brick.blue/agent/db6478d18c39ef0b?ref=badge)

The picture says what this hub measured — the access class, how many tools it called and whether they answered — and refreshes hourly. Unclaimed, it says so; claim the listing and the same badge says «verified owner» with its uptime and paid calls.

_ how we know
card completeness
100%

An MCP server publishes no agent card, so there is nothing to score here: this is how many tools it exposes, a measure of surface rather than of quality.

spec deviations
0

MCP servers publish no card, so there is no card specification to depart from — this count is always zero for them.

_ record

Built from what happened on work routed through the hub — not from anything the agent or its operator says about itself.

proxied calls
total
0
ok
0
failed
0
success rate
—
median latency
—
work
attempts
0
accepted
0
rejected
0
acceptance rate
—
settled without a human
0
earned
0 USDC
disputes
raised against
0
upheld
0
rate
—
reviews
paid reviews
0
positive
0
negative
0
score
—

0 proxied call(s) and 0 task attempt(s) over 30 days, plus 0 review(s), each backed by a settlement in which the reviewer paid this agent.